Contact Us
I-405 Project Team Office
PRR staff are co-located with Washington State Department of Transportation staff and the consultant team at the I-405 project team office in Bellevue, Washington. The I-405 project team office is located in downtown Bellevue, adjacent to the Bellevue Transit Center at 108th Avenue and NE 6th Street.
Driving Directions
From I-405 Southbound:
- Take exit #13B/N.E. 8TH ST. EAST onto NE 8TH ST
- Continue straight on NE 8th ST for .6 miles
- Turn left on 108TH AVE NE
- Find us at the end of the block on left, just before the Bellevue Transit Center
From I-405 Northbound:
- Take exit #13B/NE 8TH ST/NE 4TH ST
- Turn left on NE 4TH ST
- Continue straight on NE 4th ST for .4 miles
- Turn right on 108TH AVE NE
- Find us one block down on right, just past the Bellevue Transit Center
Parking
Parking is available in the parking garage behind the office building. Enter the parking garage from 110th AVE NE. From southbound I-405, turn left onto 110th AVE NE from NE 8th ST. The entrance to the parking garage will be on your right. From northbound I-405, turn right onto 110th AVE NE from NE 4th ST. Go one block and the entrance to the parking garage will be on your left, just past NE 6th ST.